Annual Community Water Systems Report for Fraser Lake, British Columbia for 2020-2021

The Village of Fraser Lake water system currently supplies potable drinking water to approx. 1400 residence or about 525 connections, including homes and businesses. Prior to being distributed to town services from open surface water source of Fraser Lake, all water is treated in the Level 3 Water Treatment Plant located at 305 Molywood Drive. The Water Plant currently treats approx 266,000 cubic metres of water per year. The demand on Village treatment system is at its lowest in the winter months, with approx. 517 cubic metres per day and summer being the highest at 1050 cubic metres of demand per day.

   The Water Plant treatment process involves raw lake water being pumped into the Water Treatment Plant, through a series of contact chambers and multi-media filtration tanks, that consist of Granular Media filtration and Granulated Carbon media, which in layman’s terms, are different layers of sand and gravel that separate turbidity in the water that pathogens can attach themselves to.  The filters paired with calcium chloride injection and finally ultraviolet light, support the process in successfully destroying all pathogens that may have initially entered the water supply.

   The Class 3 Water Treatment Plant Facility (as certified by Provincial regulatory body of the Environmental Operations Control Program [EOCP) is operated by two highly qualified full-time employees, that also serve in other areas of Public Works operations. One who has already obtained Level 2 certification and is working towards their level 3 Water Treatment and Water Distribution certification. The Village is obligated to securing and training other interested employee(s) that will also obtain their certification and work towards a Level 3 Water Treatment and Water Distribution certification.  Constant computer and “hands on” monitoring of plant is achieved through a series of sensors and monitors that assist operators in assuring town and business residence with the best water quality possible.

   The Village of Fraser Lake is required by the Northern Health Authority to obtain a water sample from different locations and remit the collected sample to a certified laboratory for bacteriological testing once per week. For a complete listing of bacteriological results, please visit http:/healthspace.ca/nha and select ‘water sample results’ –‘ Fraser Lake’  and then select ‘Fraser Lake CWS’. To date, all monthly (12 per year) bacteriological analysis samples have been returned as having satisfactory quality rating.  The annual chemical analysis is readily available to the public at main office, upon request. To view a detailed explanation of the results contained within the annual report please visit - http:/www.hc-sc.gc.ca/ewh-semt/water-eau/drink-potab/guide/index-eng.php. 

On an annual basis, water samples are collected from a designated location, determined by a Northern Health Authority, and  are sent to an accredited and certified laboratory  for comprehensive testing to assure all water usage users that a higher than acceptable value is maintained.

   On an annual basis, the Public Works Dept.,   flushes all Water Distribution lines, that supply town residence as a proactive approach to ensuring all Village of Fraser Lake residence of satisfactory water quality. Water Tower Reservoir is inspected bi-annually by certified diving operators, via a Remote Control for any build up on tank walls and stability of reservoir. This Inspection is recorded on a DVD and kept on file. To date, the inspections are very satisfactory. The inspection scheduled from 2020 was delayed because of Covid-19 travel restrictions but is planned again for 2021.

Looking forward to 2021, Village of Fraser Lake Administration has been very keen in pursuing grant funding for possible upgrades to Water Treatment facility that will enable a larger production of treated water along with certain aging components within SCADA system and further aging monitoring components. They have included the manufacturing expertise of Asland Technology personnel and the assistance of Urban Systems staff to look at providing conceivable plans of construction for a direct, designated supply line from Treatment Plant to Water Reservoir and then a direct line from reservoir to residence.

Maintenance and repairs to residence service lines as needed will take up any remaining time. There are a notable amount of resident curb stops that have become bent and unmanageable as a result that will be considered for replacement.


 Annual Community Water Systems Report for Fraser Lake, British Columbia for the year 2018-2019.

The Village of Fraser Lake water system currently supplies potable drinking water to approx. 1000 residence or about 525 connections, including homes and businesses. Prior to being distributed to town services from open surface water source of Fraser Lake, all water is treated in the Level 3 Water Treatment Plant located at 305 Molywood Drive. The Water Plant treated approx 200,000 cubic metres of water in 2018 . The demand on Village treatment system is at its lowest in the winter months, with approx. 517 cubic metres per day and summer being the highest at 1050 cubic metres of demand per day.

The Water Plant treatment process involves raw lake water being pumped into the Water Treatment Plant, through a series of contact chambers and multi-media filtration tanks, that consist of Granular Media filtration and Granulated Carbon media, which in layman’s terms, are different layers of sand and gravel that separate turbidity in the water that pathogens can attach themselves to . The filters, paired with calcium chloride injection and finally ultra violet light, support the process in successfully destroying all pathogens that may have initially entered the water supply.

The Class 3 Water Treatment Plant Facility ( as certified by Provincial regulatory body of the Environmental Operations Control Program [EOCP] ) is operated by two highly qualified full time employees, that also serve in other areas of Public Works operations. One who has already obtained a Level 1 certification and is working towards their level 3 Water Treatment and level 2 Water Distribution certification and the other who is starting his apprenticeship and will also work towards a Level 3 Water Treatment and Level 2 Water Distribution certification. Constant computer and "hands on" monitoring of plant is achieved through a series of sensors and monitors that assist operators in assuring town and business residence with the best water quality possible.

The Village of Fraser Lake is required by the Northern Health Authority to obtain a water sample from different locations and remit the collected sample to a certified laboratory for bacteriological testing once per week. For a complete listing of bacteriological results, please visit http:/healthspace.ca/nha and select ‘water sample results’ –‘ Fraser Lake’ and then select ‘Fraser Lake CWS’. To date, all monthly (12 per year) bacteriological analysis samples have been returned as having satisfactory quality rating. The annual chemical analysis is readily available to the public at main office, upon request. To view a copy of the report click here.  To view a detailed explanation of the results contained within the annual report please visit http:/www.hc-sc.gc.ca/ewh-semt/water-eau/drink-potab/guide/index-eng.php.

On an annual basis, water samples are collected from a designated location, determined by a Northern Health Authority, and are sent to an accredited and certified laboratory for comprehensive testing to assure all water usage users that a higher than acceptable value is maintained.

On an annual basis, the Public Works Dept., flushes all Water Distribution lines, that supply town residence as a proactive approach to ensuring all Village of Fraser Lake residence of satisfactory water quality. Water Tower Reservoir is inspected bi-annually by certified plant operators, also inspected by a certified inspector for any build up on tank walls. This Inspection is recorded on a DVD and kept on file. To date, the inspections are very satisfactory. The water Intake Screen is inspected by certified diving company. The inspection is recorded on a DVD and written inspection report sent to administration for filing.

Regular maintenance for 2019 will include repairs to leaks on hydrant and hydrant shut off at 199 Tunasa Crescent, leaking service saddle at 222 Tunasa Crecent and Leaking connection on water main line at 545 Simon Fraser Ave. Main line water shut off valves are scheduled to be replaced at 6 locations in or around Chilako Crescent. Curb stop at 222 Tunasa Crescent is scheduled for replacement in 2019 .

 

 

 

Village of Fraser Lake

Municipal Office Hours & Location
Weekdays 8:00 am – 4:00 pm (Closed Statutory Holidays)

PO Box 430, 210 Carrier Cres.
Fraser Lake, British Columbia V0J 1S0

Phone 250-699-6257
Fax 250-699-6469
Email Village Office

Connect with Us

Find us on your favourite networks!