| Section |
Description |
A1 Penalty |
A2 Early Payment |
A3 Late Penalty |
A4 Compliance Agreement Available |
| 3.1 |
Interference with a Bylaw Officer |
$250 |
$200 |
$300 |
No |
| 5.3.1(a) |
Excessive Construction Noise without a permit |
$400 |
$300 |
$500 |
Yes |
| 5.3.2(a) |
Fail to notify businesses and residents of construction noise |
$400 |
$300 |
$500 |
Yes |
| 5.4 |
Excessive Noise |
$100 |
$50 |
$150 |
Yes |
| 6.4.1(a) |
Rubbish, garbage, and discarded material accumulated |
$200 |
$150 |
$250 |
Yes |
| 6.4.1(b) |
Accumulation of offensive or unwholesome matter |
$100 |
$50 |
$150 |
Yes |
| 6.4.1(c) |
Accumulation of water |
$100 |
$50 |
$150 |
Yes |
| 6.4.1(d) |
Unmaintained grass or vegetation |
$100 |
$50 |
$150 |
Yes |
| 6.4.1(d)(iii) |
Vegetation obstructing utility, highway, sidewalk, or visibility of intersection |
$200 |
$150 |
$250 |
Yes |
| 6.4.1(e) |
Accumulation of unstacked firewood |
$50 |
$25 |
$75 |
Yes |
| 6.4.1(f) |
Accumulation of motor vehicle parts or other mechanical parts |
$100 |
$50 |
$150 |
Yes |
| 6.4.1(g) |
Unregistered or uninsured motor vehicles in excess |
$200 |
$150 |
$250 |
Yes |
| 6.4.1(h) |
Recreational Vehicles in excess |
$200 |
$150 |
$250 |
Yes |
| 6.4.1(i) |
Vegetation interfering with infrastructure or utilities |
$300 |
$200 |
$400 |
Yes |
| 6.4.1(j) |
Graffiti |
$100 |
$50 |
$200 |
Yes |
| 6.4.1(k) |
Accumulation of building materials |
$200 |
$150 |
$300 |
Yes |
| 6.5 |
Improperly placed, enclosed, or maintained compost piles |
$100 |
$50 |
$150 |
Yes |
| 6.6.2 |
Water directed at adjacent premises or public spaces |
$200 |
$150 |
$300 |
Yes |
| 6.6.3 |
Dust |
$200 |
$150 |
$250 |
Yes |
| 6.6.4 |
Outdoor lighting |
$100 |
$50 |
$150 |
Yes |
| 6.7 |
Pests |
$200 |
$150 |
$300 |
Yes |
| 6.8 |
Fences in disrepair |
$100 |
$50 |
$150 |
Yes |
| 6.9.1 |
Depositing yard waste on a boulevard or lane |
$300 |
$200 |
$400 |
No |
| 6.9.1(a) |
Grass or weeds exceeding 15cm in length along boulevard |
$200 |
$150 |
$250 |
Yes |
| 6.9.1(b) |
Parking a motor vehicle, trailer, or recreational vehicle on a boulevard without a valid permit |
$300 |
$250 |
$350 |
Yes |
| 6.10.1 |
Accumulation of ice, icicles, snow, rubbish or dirt on roofs, gutters, projections or cornices that could slip, slide, fall or be blown upon a sidewalk or street |
$200 |
$150 |
$250 |
Yes |
| 6.10.2 |
Depositing snow over 1 metre at the curb line |
$100 |
$50 |
$150 |
Yes |
| 6.10.4 |
Depositing snow or ice on a sidewalk or other public pedestrian use |
$300 |
$250 |
$400 |
Yes |
| 6.10.5 |
Leaving a vehicle parked that interferes with snow removal operations |
$100 |
$50 |
$150 |
No |
| 6.11.2(a) |
Lawn watering outside of designated hours and days |
$100 |
$50 |
$200 |
No |
| 6.11.4 |
Watering when additional water conservation measures are in place |
$400 |
$300 |
$500 |
No |
| 7.2.1(a) |
Not maintaining a derelict building as required |
$400 |
$300 |
$500 |
Yes |
| 7.2.1(b) |
Not securing a derelict building as required |
$400 |
$300 |
$500 |
Yes |